Located near Fisherman’s Wharf in San Francisco, North Shore Pump Station is a part of the North Point Wet-Weather Facility (NPF), which provides primary treatment for disinfection of wastewater. The facility is a two-story building that is completely embedded in soil, and the subsurface conditions include potentially liquefiable sand layers and soft Bay Mud deposits sitting on bedrock sloping toward the east side waterfront. The building is supported by piers extending all the way into the Franciscan Complex bedrock.
Dr. Jiang has solid experience developing high performance multi-physics simulation frameworks as well as preconditioner/iterative solver packages for unconventional oil & gas production. Areas of expertise include reservoir engineering, fracture characterization, computational fluid dynamics, transient analysis, numerical algorithms, matrix preconditioning and iterative solving methods, high-performance computing, and software development (using C/C++, Fortran, Python, etc.).
Engineer
ChinaHydroChina - Itasca R&D Center
This website uses cookies to ensure you get the best experience on our website.