Rock Mechanic Analysis for Crown Pillar Extraction at Tara (2017)
Boliden Tara Mines is Europe’s largest zinc mine, with an annual production of 2.6 million tones of ore, and has been in operation since 1977. This project was part of the required planning application to the authorities regarding crown pillar extraction in the norther portion of Boliden Tara Mines. It was conducted in two phases – first a continuum model was analyzed in FLAC3D, which was then followed by a discontinuum modelling in 3DEC with included faults.

Dynamic Soil Structure Interaction Analyses of North Shore Pump Station (2017)
Located near Fisherman’s Wharf in San Francisco, North Shore Pump Station is a part of the North Point Wet-Weather Facility (NPF), which provides primary treatment for disinfection of wastewater. The facility is a two-story building that is completely embedded in soil, and the subsurface conditions include potentially liquefiable sand layers and soft Bay Mud deposits sitting on bedrock sloping toward the east side waterfront. The building is supported by piers extending all the way into the Franciscan Complex bedrock.

Mechanical testing of a model baked anode material with PFC (2017)
A baked anode is a complex material, that results from the mixing and baking of different petrol coke grains, with different size distributions, with a pitch. A preliminary study (ICSAS16-CST-MFG-35143-01) developed a PFC2D model accounting for the microstructure of a baked anode, using the Bonded Particle Model (BPM).

Investigation of Mine Access Tailings Storage in an Open Pit (2017)
The mine is interested in using the decommissioned open pit for storage of tailings from the underground mine, as this would be beneficial both from an environmental and an economical perspective. The implementation will be a technical challenge since portions of the crown pillar separating the open pit from the underground mining has been extracted.

Parking Ramp over Light Rail Station (2016)
A parking ramp expansion has been proposed at Terminal 1-Lindbergh to be constructed over the north end of the Metro Transit Light Rail (LRT) station. Itasca assessed the magnitude of the principal impacts by conducting three-dimensional geostructural analyses of the LRT station using 3DEC. Of the six designs evaluated, all but one option were predicted to be geostructurally feasible.

Reinforcing a tunnel face using grouted fiberglass bolts (2016)
The aims of this work is to study the influence of face reinforcement on the tunnel stability and to check if the creep behavior of the rock may induce a potential jamming of the TBM during the excavation stop.

Effect of yielding supports on the behavior of deep tunnels (2016)
Project on the extension works for the Underground Research Laboratory (URL) at Bure (France).

Bench Stability Analysis at Björkdalsgruvan (2016)
The Björkdal mine ("Björkdalsgruvan"), located 28 km northwest of the town of Skellefteå, is a gold mine with the mineralization typified by Au-quartz veins located within a metamorphic package. The Björkdal mine is operating with both open pit- and underground mining. During spring 2016 the mine experienced local slope instability at one of the open pit walls. The concern was how it would affect safety for the mine workers and future mining, but also if it was safe to remove loose rock mass without endangering workers or interrupt any mining activities.

Building a baked anode material with PFC (2016)
A baked anode is made of a complex material, obtained by mixing and baking different petrol coke grains, with different size distributions, with a pitch. Hydro PMT needs to study how cracks propagate in such a material – both within and between grains. Representing properly the non-spherical grain shapes, as well as the porosity, both between grains and within the coke grains, are therefore prerequisites.

Fountain Slide – Slope Stabilization using Micropiles and Anchors (2016)
Fountain Slide has a long history of stability problems. The slope is bounded downhill by the Fraser River and uphill by a highway and a railway. This project stage focused on stabilization of a section of the railway that has suffered extensive damage to its retaining system.

Solution-Mining Modeling (2016)
A confidential mining client was interested in evaluating various potential future solution-mining scenarios using a numerical model in order to assess potential ore recovery, capital costs, and cavern lifetimes, as well as to overall optimize the proposed mine plan. Modeling of solution mining requires that the key processes controlling the mineral dissolution are modeled; however, there are numerous factors that complicate the details of the dissolution process that are impractical or impossible to account for in a model.

Geometry Model for the Follo Line Project (2016)
The Follo Line project is the largest railway project in Norway in modern times. The Follo Line is a high-speed railway partly in tunnel from the traffic hub at Ski to Oslo central station. The project comprise a 20 km long tunnel. The new railway is passing through central Oslo, beneath existing infrastructure which creates challenging conditions due to overlapping tunnels and multiple intersections.

Back-Analysis of Initial Stress at Shallow Depth – A Case Study (2016)
At shallow depth, the initial stress state can significantly affect the behavior of the rock mass around excavations, but stress measurements are usually subjected to high levels of uncertainty. This was the case at the Odenplan railway station in Stockholm where unexpectedly large deformations were measured during the excavation.

Discrete modelling of lime kilns (2016)
KERNEOS Aluminate Technologies wishes to exploit the bauxite fines generated during the extraction, conditioning and transport of bulk bauxite, which are currently unused. To achieve this objective, the PARC project was built around 2 academics and 4 industrial companies, experts in their field.

Numerical modeling of dredged sand filled geotextile tubes behavior under seismic loading (2016)
A nearshore 120m long causeway is planned for the Mozambique LNG TMOF Project. Geosintex S.R.L. proposes a structure composed by synthetic geotubes (see Figure) for protecting the road against erosion. The mechanical behavior of this structure must be understood better. The evaluation of the potential for liquefaction of the road sandy basement and the geotubes filling material is of particular interest.