Dewatering and Depressurization

Itasca is experienced in estimating the dewatering needs of a construction site or mine to temporarily lower groundwater levels below the natural groundwater level, in all seasons, to provide for safe excavation construction and working environment during operations. Itasca also predicts dewatering rates, performing numerical modeling to estimate dewatering and to design and optimize the dewatering and water-disposal systems, drain holes, and monitoring wells for tunnels, caverns, foundations, and construction sites.

Latest News
  • ITASCA Releases MassFlow version 9.0 ...
    Read More
  • Introducing IMAT (ITASCA Mining Analysis Toolbox): Transforming Mining Analysis Solutions ...
    Read More
  • 3DEC 9 Officially Released ITASCA announces the release of 3DEC v9, an advanced three-dimensional, hybrid discontinuum and continuum modeling...
    Read More

Upcoming Events
29 May
Getting Started with FLAC2D/FLAC3D
Objectives of the training: •Understand the FLAC2D/ FLAC3D numerical approach and the types ofproblems it can solve•Know how to manipul... Read More
5 Jun
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p... Read More
2 Jun
6th Itasca Symposium on Applied Numerical Modeling
Itasca is pleased to announce that the 6th Itasca Symposium on Applied Numerical Modeling will take place June 3 - 6, 2024, in Toronto,... Read More