Dewatering

Itasca can estimate the dewatering needs of a construction site or mine to temporarily lower groundwater levels below the natural groundwater level, in all seasons, to provide for safe excavation construction and working environment during operations. Itasca can predict dewatering rates, including numerical modeling to estimate dewatering and design and optimize the dewatering and water-disposal systems, drain holes, and monitoring wells.

Latest News
  • ITASCA Releases MassFlow version 9.0 ...
    Read More
  • Introducing IMAT (ITASCA Mining Analysis Toolbox): Transforming Mining Analysis Solutions ...
    Read More
  • 3DEC 9 Officially Released ITASCA announces the release of 3DEC v9, an advanced three-dimensional, hybrid discontinuum and continuum modeling...
    Read More