Example of Shimizu Tunnel No 3 in UDEC 7.00

Software

Version Notes:
UDEC 7.00

Level: Intermediate
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services
Displacements in UDEC model

This example demonstrates the use of UDEC to model a tunnel excavation in jointed rock mass. In this demonstration, geometry sets are used to create the tunnel geometry. The Barton Bandis model is used to represent the joints. The "block solve relax" command is used to simulate the pre-relaxation of the rock mass while excavating the tunnel.

Keywords

  • Geometry sets
  • Barton-Bandis
  • Ground reaction curve
  • Shotcrete
  • Bolt
Latest News
  • ITASCA Releases MassFlow version 9.0 ...
    Read More
  • Introducing IMAT (ITASCA Mining Analysis Toolbox): Transforming Mining Analysis Solutions ...
    Read More
  • 3DEC 9 Officially Released ITASCA announces the release of 3DEC v9, an advanced three-dimensional, hybrid discontinuum and continuum modeling...
    Read More

Upcoming Events
29 May
Getting Started with FLAC2D/FLAC3D
Objectives of the training: •Understand the FLAC2D/ FLAC3D numerical approach and the types ofproblems it can solve•Know how to manipul... Read More
5 Jun
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p... Read More
2 Jun
6th Itasca Symposium on Applied Numerical Modeling
Itasca is pleased to announce that the 6th Itasca Symposium on Applied Numerical Modeling will take place June 3 - 6, 2024, in Toronto,... Read More