Itasca developed a numerical model to estimate gold (Au) production from heapleach operations. The objective was to simulate Au heap leaching using a model based on fluid flow and mass-transport (hydrodynamic modeling) in a partially saturated pad, and quantitatively assess monthly production of gold-cyanide production (AuCN).
Mr Hebert is a geotechnical engineer with experience in both the mining and civil industries. He has provided consulting on many projects including underground mining (e.g. block cave mining, pillar stability), open pit mining, underground excavations (e.g. tunnels, caverns, nuclear waste storage) and dams.
Itasca is participating at FRAGBLAST 12 in Luleå! Read more here!
This website uses cookies to ensure you get the best experience on our website.