Rock Mechanics Support for the Dannemora Mine (2014)
The Dannemora mine has been in production since (at least) 1481 until its first closure in 1992. The fact that the mine is very old, but also has been closed for some time, has influenced the infrastructure and mine planning during the earlier era of mining.
Solid segregation of limestone-coal mix discharged on a conoid system (2014)
SOLVAY S.A. wanted to assess the capability of the discrete-modeling approach to reproduce the behavior and the segregation of a mix of blocks (limestone + coal) discharged on a spreading system (conoid). A PFC3D model was developed to reproduce this complex system.
Long term behavior of claystone and its interaction with steel casing (2014)
Study of potential damage in the claystone surrounding a HLW disposal cell for storage of high-level radioactive waste (HLW waste).
Extraction of Crown Pillar in Kittilä (2014)
Extraction of the crown pillar separating the open pit from the underground mining was to be conducted as a part of the transition from open pit to underground mining at the Kittilä mine. Itasca carried out a study of crown pillar mining on the stability of the open pit and underground infrastructure.
3D-Analysis of the Stockholm By-Pass Road Tunnel (2014)
A new motorway west of Stockholm linking the north and south side of Stockholm is under development – the so-called "Stockholm By-Pass" ("Förbifart Stockholm"). The new link is a 21 km long highway, of which 18 km is in tunnels. At the interchange of Lovön, four intake and exhaust air stations are planned, being in close proximity to the main tunnels and ramps. In this area, there is also a deformation zone going through the intake and exhaust air station.
El Teniente Fragmentation Study (2013)
Fragmentation is an important aspect of all block caving operations. The primary fragmentation can be difficult to assess, in particular in complex geological environments, and for rock masses subjected to varying stress as is normally the case in block caving.
Laver Rock Mechanics Pre-Feasibility Study (2013)
Boliden is investigating the Laver low-grade copper deposit for potential future mining. The old Laver deposit was discovered in the 1930s, and was operated between 1938 and 1946. Mining was primarily conducted as small-scale underground mining, but a small open pit was also in operation at that time. The currently investigated deposit is of larger scale and with lower grades. Investigations have been on-going since 2008, including geophysical investigations, outcrop mapping, sampling of drill cuttings, and diamond core drilling. The mineralization is not defined at depth and/or in strike extension.
Improved Blasting through Precise Initiation (2013)
Using blasting caps with electronic delay units, and programmable delay times down to 1 ms, it has become possible to employ wave superposition in rock blasting. It has been hypothesized that fragmentation is improved in areas between blastholes where the tensile waves meet, overlap and interact. An improved fragmentation can, in turn, result in reduced costs for both blasting and transportation of the blasted rock, improved environmental aspects, and reductions in energy consumption during crushing and grinding of the blasted rock, as well as improved metal recovery. In this project, the above hypothesis was further studied in conjunction with developing computational tools for simulation of blasting with electronic programmable delay caps.
Crookston Landslide Stabilization (2013)
In 2003, a landslide developed along the Red Lake river bank inside the city of Crookston, Minnesota. Although several attempts were made to solve the problem, in 2008, a second event occurred, and extensive instrumentation was then put in place to monitor the slope and gain a better understanding of the situation. In 2013, the Minnesota Department of Transportation issued a design and build project to improve the stability of the river bank.
Stress Modeling Malmberget (2013)
LKAB plans to increase the production in Malmberget mine to 20 million metric tons of iron ore per year. The objective of this work was to create a detailed model of all orebodies to study the stress situation with continued ore production at depth.
Modeling of the formwork removal of a rubble stone masonry bridge (2013)
Comprendre les phénomènes physiques mis en jeu lors du décintrement d’un pont en maçonnerie
Long Term Cavern Stability of the SFR Facility (2012)
A numerical analysis was conducted to assess the long term stability of the rock caverns BMA and BLA for the final repository of low and middle level nuclear waste at the SFR facility in Forsmark, Sweden. The objective was to analyze if there exists a long term risk for an ongoing loosening of the rock mass up to the surface due to degradation and weathering of the rock mass adjacent to the walls of the rock caverns.
A new loading system to limit segregation of a limestone-coal mix loaded in a cylindrical hopper (2012)
SOLVAY S.A. wanted to characterize the potential segregation of a mix of blocks (limestone + coal) charged into a cylindrical hopper. An intermediate loading structure between the conveyor and the hopper is added to limit segregation observed in a previous study.
Numerical Modeling of Mining Sequences and Seismicity (2012)
Mining-induced seismicity is one of the most serious rock mechanics problems in sublevel caving in the LKAB mine in Kiruna.