Karowe Mine Groundwater Flow Model and Predictive Dewatering Simulations (2017)

Karowe Mine, located approximately 16 kilometers (km) southwest of the town of Letlhakane, is a diamond mine where the second largest diamond ever found on record, with a weight of 1,111 carats, was discovered. This project involved simulating mine dewatering and excavation to evaluate future dewatering requirements, as well as providing guidance for future monitoring borehole and piezometer designs.

Investigation of Mine Access Tailings Storage in an Open Pit (2017)

The mine is interested in using the decommissioned open pit for storage of tailings from the underground mine, as this would be beneficial both from an environmental and an economical perspective. The implementation will be a technical challenge since portions of the crown pillar separating the open pit from the underground mining has been extracted.

Mechanical testing of a model baked anode material with PFC (2017)

A baked anode is a complex material, that results from the mixing and baking of different petrol coke grains, with different size distributions, with a pitch. A preliminary study (ICSAS16-CST-MFG-35143-01) developed a PFC2D model accounting for the microstructure of a baked anode, using the Bonded Particle Model (BPM).

Rock Mechanics Study for the Kevitsa Strategy Project (2017)

The Kevitsa open pit mine has been in operation since 2012 and was acquired by Boliden in 2016. A new strategic plan is currently being developed to investigate an increase in production. In conjunction with this, the geotechnical slope design parameters for the final pit depth, including a possibly deeper pit, need to be analyzed.

Dynamic Soil Structure Interaction Analyses of North Shore Pump Station (2017)

Located near Fisherman’s Wharf in San Francisco, North Shore Pump Station is a part of the North Point Wet-Weather Facility (NPF), which provides primary treatment for disinfection of wastewater. The facility is a two-story building that is completely embedded in soil, and the subsurface conditions include potentially liquefiable sand layers and soft Bay Mud deposits sitting on bedrock sloping toward the east side waterfront. The building is supported by piers extending all the way into the Franciscan Complex bedrock.

Rock Mechanic Analysis for Crown Pillar Extraction at Tara (2017)

Boliden Tara Mines is Europe’s largest zinc mine, with an annual production of 2.6 million tones of ore, and has been in operation since 1977. This project was part of the required planning application to the authorities regarding crown pillar extraction in the norther portion of Boliden Tara Mines. It was conducted in two phases – first a continuum model was analyzed in FLAC3D, which was then followed by a discontinuum modelling in 3DEC with included faults.

Modeling and Calibration of a Blocky Granite Rock (2017)

In the framework of the development of a subsea tidal turbine, the design of the foundations has to be optimal. Cathie Associates, on behalf of HydroQuest, wanted us to investigate the penetration of a single steel foundation pin in a granitic rock mass by using a discrete numerical approach and follow the state of the damaged zone around the tip during penetration.

Sjömalmen — Cave Modeling and Prediction of Ground Deformations (2017)

The city of Kiruna is partly located on the hanging wall side of the LKAB Kiirunavaara Mine. In the long-term perspective, it is not possible to have any residential buildings or infrastructure within the fracture zone and cave zone resulting from mining. An urban transformation process for the Kiruna city center is thus currently underway. The current prognosis is empirical based on observations since the early 1960s until today.

Modelling concrete slab on rigid inclusion reinforced soil (2017)

In the context of a wine cellar extension project, a 20cm thick concrete slab is to be constructed on a soil reinforced by rigid inclusions. Itasca France has been called by the design office to verify the mechanical resistance of the concrete slab and assess its settlement under a uniform load.

Seismic Deformation Analyses of a Hydraulic Fill Embankment Dam (2017)

As part of evaluation of seismic performance of this 175-foot high hydraulic fill dam located at a confidential site in the southeast Appalachia region, Geosyntec hired Itasca Consulting Group (Itasca) to perform deformation analyses for seismic loading of the dam using numerical modeling. Prior to the deformation analyses, Itasca also assisted Geosyntec with numerical simulations to assess the liquefaction potential of the dam using the cyclic stress ratio approach.

Back-Analysis of Initial Stress at Shallow Depth – A Case Study (2016)

At shallow depth, the initial stress state can significantly affect the behavior of the rock mass around excavations, but stress measurements are usually subjected to high levels of uncertainty. This was the case at the Odenplan railway station in Stockholm where unexpectedly large deformations were measured during the excavation.

Solution-Mining Modeling (2016)

A confidential mining client was interested in evaluating various potential future solution-mining scenarios using a numerical model in order to assess potential ore recovery, capital costs, and cavern lifetimes, as well as to overall optimize the proposed mine plan. Modeling of solution mining requires that the key processes controlling the mineral dissolution are modeled; however, there are numerous factors that complicate the details of the dissolution process that are impractical or impossible to account for in a model.

Geometry Model for the Follo Line Project (2016)

The Follo Line project is the largest railway project in Norway in modern times. The Follo Line is a high-speed railway partly in tunnel from the traffic hub at Ski to Oslo central station. The project comprise a 20 km long tunnel. The new railway is passing through central Oslo, beneath existing infrastructure which creates challenging conditions due to overlapping tunnels and multiple intersections.

Definition and flow analysis of UFM model for the Forsmark site (2016)

The Forsmark site is studied in the context of the Swedish nuclear disposal project. One key step is defining, at the relevant depths ‐ from 200 to 400m ‐ a Discrete Fracture Network (DFN) model. The DFN modeling framework is based on simplified rules that mimic the kinematic processes governing fracture nucleation, growth and arrest (models are named UFM for likely Universal Fracture Model).

Discrete modelling of lime kilns (2016)

KERNEOS Aluminate Technologies wishes to exploit the bauxite fines generated during the extraction, conditioning and transport of bulk bauxite, which are currently unused. To achieve this objective, the PARC project was built around 2 academics and 4 industrial companies, experts in their field.

1 2 3 4 5 6
Latest News
  • Newsletter October 2023 ...
    Read More
  • Newsletter August 2023 ...
    Read More
  • New General Manager for ITASCA Sweden We have appointed a new GM in Sweden!...
    Read More