Analysis of a Concrete Diaphragm Wall

Software

Version Notes:
FLAC 8.0

Level: Intermediate
Runs in Demo: Yes

Write Up
Walk Through
Project Files
Beratungsleistungen

The stages of construction of a concrete diaphragm wall are simulated with FLAC. The analysis begins with the concrete diaphragm wall cast in place. Dewatering, excavation and installation of support struts are simulated in five excavation stages. Distribution of shear forces and bending moments in the wall, axial forces in the struts and displacements of the soil behind the wall are calculated during the five stages.

Keywords

  • Multistage excavation
  • Dewatering
  • Concrete diaphragm wall
  • Support struts
  • Importing stratigraphy geometry
  • Beam elements
  • Interfaces
  • Large strain
  • Mohr-Coulomb model

Materials

  • Concrete
  • Soil

Analyses

  • Fluid Flow
  • Static
Neuesten Nachrichten
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    Weiterlesen
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....
    Weiterlesen
  • Itasca International Inc. announces the Selection of its New CEO Itasca International Inc. announces the Selection of its New CEO ...
    Weiterlesen